Arch2Arch Tab BEA.com
Syndicate this blog (XML)

AquaLogic BPM 6.1 - BPMN

Bookmark Blog Post

del.icio.us del.icio.us
Digg Digg
DZone DZone
Furl Furl
Reddit Reddit

Alex Toussaint's Blog | April 28, 2008   4:50 PM | Comments (1)


In AquaLogic BPM Suite 6.1 we are improving our support for BPMN. Below is a pre-release snapshot showing a process represented with the updated BPMN constructs. You should notice the improved editor showing the BPMN functional groups, on the right side, such as: Activities, Gateways, Events, Flow, Globals, and Artifacts. The Business Analyst profile has been revisited as well to maximize modeling space and easy-of-use.

BPMN_Studio61 

To improve BPMN support we added a new Timer activity and updated some icons to better match the spec. Below are some of the new and updated icons - the final icons will be included in the 6.1 package, this is still work in progress:

 

new_icons_61

The meaning of the icons above, from left to right, top to bottom, with their respective BPMN (ALBPM) equivalents are: XOR (Conditional), Loop, Message Event (Notification Wait One Argument), Multiple Event (Notification Wait Multiple Argument), OR (Split Or), Send Message Event (Process Notification), AND (Split), Multiple Instance (Split N), and Timer Event (Timer Activity).

For a complete list of BPMN references and general information of the spec please visit:

This is it for now, more updates about ALBPM 6.1 coming soon here!

Cheers,

--alex

 

Technorati tags:  BPMN


Comments

Comments are listed in date ascending order (oldest first) | Post Comment

  • Hi,

    My colleague Jesper just posted a much better picture of our BPMN support, using the latest pre-release build of ALBPM 6.1.

    Please follow the link below:

    Cheers,

    --alex

    Posted by: atoussai on April 29, 2008 at 11:05 AM



Only logged in users may post comments. Login Here.

Powered by
Movable Type 3.31